Step 1: High Pressure Clean – all excess dirt, grime, moss and other contaminates removed at 3000psi. |
![]() |
|
Step 2: Replace all faulty, broken, chipped or displaced tiles. JMZ Surface Treatment applied to sterilise mould and fungus growth. |
![]() |
|
Step 3: Full Rebed - remove all Ridge-Capping and all old bedding material from jobsite. Mix new bedding material and rebed all Ridge-Capping using bedding racks to ensure straight ridges and insert weep holes. |
![]() |
|
Step 4: Full Re-Point – All ridge-caps to be fully repointed using flexibling pointing and insert weep holes. |
![]() |
|
Step 5: Surface Sealed – JMZ Roof Sealer is applied to ensure maximum adhesion of Roof Membrane coats |
![]() |
|
Step 6: JMZ Roof Membrane brushed onto all ridge capping as an extra preventative coat to high stress areas of the roof - then 1st coat of JMZ Roof Membrane applied to entire roof |
![]() |
|
Step 7: Final Coat – Another coat of JMZ Roof Membrane is applied ensuring protection against fading for 10 years, all backed by a written warranty from JMZ Roof Restorations. |
![]() |