JMZ Roof Restoration
JMZ Roof Restoration

Supply and Install 2 x Whirlybirds - Offer ends 31 January 2010

Unit 2 / 30 Shore Street
Cleveland QLD 4163

Come and visit our professional showroom

Office Hours

Mon-Fri:  8:00am - 5:00pm
Sat:  Closed  - 
Sun:  Closed

 

VIDEO OF OUR PROVEN 7 STEP ROOF RESTORATION PROCESS



 

Step 1:

High Pressure Clean – all excess dirt, grime, moss and other contaminates removed at 3000psi.

 step 1 of proven JMZ roof restoration process

Step 2:

Replace all faulty, broken, chipped or displaced tiles. JMZ Surface Treatment applied to sterilise mould and fungus growth.

 step 2 of proven JMZ roof restoration process

Step 3:

Full Rebed - remove all Ridge-Capping and all old bedding material from jobsite. Mix new bedding material and rebed all Ridge-Capping using bedding racks to ensure straight ridges and insert weep holes.

 step 3 of proven JMZ roof restoration process

Step 4:

Full Re-Point – All ridge-caps to be fully repointed using flexibling pointing and insert weep holes.

 step 4 of proven JMZ roof restoration process

Step 5:

Surface Sealed – JMZ Roof Sealer is applied to ensure maximum adhesion of Roof Membrane coats

 step 5 of proven JMZ roof restoration process

Step 6:

JMZ Roof Membrane brushed onto all ridge capping as an extra preventative coat to high stress areas of the roof - then 1st coat of JMZ Roof Membrane applied to entire roof

 step 6 of proven JMZ roof restoration process

Step 7:

Final Coat – Another coat of JMZ Roof Membrane is applied ensuring protection against fading for 10 years, all backed by a written warranty from JMZ Roof Restorations.

 step 7 of proven JMZ roof restoration process